Our exterior work in North Side starts with the whole building, not one elevation. A detached brick home’s siding installation and repair needs, its cornice and trim repair, and its waterproofing and sealants are one job seen from different sides: water finds the weakest layer first, and the repair that stops it is worth ten that cover its evidence. The same discipline covers exterior painting — paint is the building’s weather skin, and it only protects a surface that was prepared properly beneath it.
On pre-war apartment buildings the scope is larger and the coordination matters more: facade work, roof-edge work and masonry repair done as one plan, so scaffolding goes up once and the building is not revisited for the same leak three times. Our masonry contractors in North Side handle the brick and stone, and our roof repair and installation contractors in North Side handle the roof edge and flashing lines, so the envelope is treated as one system rather than three trades passing the problem along.
Learn more about our parent service on our exterior repair and renovation page.
Exterior repair and renovation is the work of keeping a building’s outside sound and weather-tight — the siding and trim, the masonry and stucco, the flashing lines, gutters and ground-level waterproofing that stand between the structure and the seasons. Repair means finding the actual failure — the failed joint, the rotted board, the flashing that opened — and fixing that, not covering it. Renovation means the larger coordinated job: repointing and resurfacing, replacing what is spent, and bringing the whole elevation back to a state where paint and sealant can do their job.
In North Side that work runs at two scales: the detached brick home, where one owner decides the whole front, and the pre-war apartment building, where the facade serves dozens of households and the work is planned around occupied homes. Either way the sequence is the same — survey first, stop the water second, finish last — because any other order is just scheduling the same repair twice.

If your building’s elevations are showing their age — pointing that has washed out, trim that has softened, paint that is failing in sheets, or water appearing at grade after every storm — talk to Star Construction INC before the next season turns a repair into a rebuild. Request a free, no-obligation estimate and we will walk the elevations with you, separate the cosmetic from the structural, and sequence the work honestly. See all the areas we serve on our service areas page.
Our clients value the consistency, structural precision, and long-term performance we deliver on every project, from initial planning through final execution.
![]()
Jav VTrustindex verifies that the original source of the review is Google.
Got my bathroom remodel Team was professional on time Thank you![]()
Ever fernando Perez saldañaTrustindex verifies that the original source of the review is Google.
Crear Word![]()
LUIS CAYOTrustindex verifies that the original source of the review is Google.
i hire them for my home project. and everyting went smoothly. no delays![]()
Shahid IqbalTrustindex verifies that the original source of the review is Google.
Very reliable contractor. They did exactly what they promised and the quality was excellent. Would definitely recommend.
Contact us now to discuss your project and receive a no-obligation quote from our experts.
Every project is handled through a defined process that ensures accuracy, efficiency, and long-term structural performance from start to finish.
We begin by reviewing site conditions, understanding project objectives, and identifying structural requirements to establish a clear and practical direction before any work begins.
A detailed execution plan is developed, including material selection, sequencing of work, and coordination of labor to maintain consistency and avoid delays during construction.
Work is carried out using proven installation methods, with attention to structural integrity, proper reinforcement, and adherence to safety and quality standards.
A final walkthrough is conducted to verify workmanship, resolve any outstanding details, and ensure the completed project meets performance expectations and durability standards.
Reading the Exterior — the North Side’s building envelope in four parts. A building’s outside fails as a system, not as isolated defects: the roof edge, the facade, the grade and the entry all trade the same water back and forth. The sections below take each part in the order water travels — from the whole elevation down to the ground it stands on — and each ends with the same test: was the water stopped, or only hidden?
A detached brick home’s overhaul is the fullest version of this work: repointing the elevations in matched mortar, rebuilding the failed sections of trim and siding, replacing gutters and flashing lines that have been patched too many times, and bringing the entry and ground-level waterproofing up to the same standard. The value of doing it as one job is coordination — the scaffold serves every trade, the materials match across the whole front, and nothing is painted over a problem that another crew will open next year.
Pre-war apartment buildings rarely need just one trade. A parapet flashing failure shows up as a facade stain; a masonry joint failure lets water behind the roof edge; a roof drain problem soaks the wall below it. Treating these as separate jobs means each crew blames the last one’s work. Our approach puts the facade, roof and masonry scopes under one plan with one sequence: scaffolding once, water paths traced end to end, and repairs ordered so each layer protects the next — which is also how occupied buildings stay livable through the work.
The bottom of the wall is where exterior work succeeds or fails, and North Side buildings test it hard: grade that slopes toward the foundation, gutters that discharge at the wall, soil piled against brick that was never meant to sit in damp. Waterproofing at grade means regrading so water leaves the building, sealing the below-grade wall properly, and keeping gutters and leaders clear so the water that falls on the roof does not become the water in the basement. It is unglamorous work, and it is the work that makes every other exterior repair last.
The entry is the part of the exterior everyone touches, and on North Side buildings it is often the most tired: a stoop that has settled, steps whose nosings have rounded off, railings loose at their pockets. Rebuilt as part of the whole-front job — rather than as a separate afterthought — the entry gets the same footing, drainage and materials discipline as the rest of the elevation, and the finished front reads as one building again instead of a new door on an old face.
A full-exterior overhaul covers the whole envelope in one coordinated job: repointing and masonry repair on the elevations, siding and trim repair or replacement, flashing lines and gutters renewed, waterproofing at grade, and the entry and stoop rebuilt where they have settled. What it does not include is guesswork — the scope is set by a survey of every elevation first, so the price covers named work, not a contingency for surprises nobody looked for.
Where the problems are connected — and on pre-war buildings they usually are — together is cheaper and better: one scaffold, one sequence, and each repair protecting the next. Staging makes sense when budgets or building logistics require it, or when one scope is urgent and another can wait a season. We lay out both options with their trade-offs and let the building’s condition, not our schedule, decide.
Start outside, not inside. Water at grade usually means grade sloping toward the building, gutters discharging at the wall, or failed waterproofing on the below-grade wall. The fix is regrading so water runs away, keeping leaders clear and discharging away from the foundation, and sealing the below-grade wall where it is accessible. Interior coatings alone, without fixing the outside source, only hide the water until it finds the next joint.
Yes, and it usually should be — the entry is part of the same elevation and the same water story. A stoop rebuild as part of the whole-front job shares the scaffold, the footing and drainage work, and the materials, so the finished front reads as one building. Rebuilt on its own, a stoop still gets the same footing and drainage discipline; it just does not get the economies of the larger job.
In general New York City terms, like-for-like exterior repairs are usually straightforward, while structural changes, work affecting the public sidewalk or street, and work on taller buildings can involve Department of Buildings permits and coordination — and any work on a building under facade safety rules needs to fit that building’s filing cycle. We confirm what your specific job needs before quoting, so permits are planned rather than discovered.