
As interior renovation contractors in New York, we see Bronxville kitchens differently from new-build kitchens: the rooms are smaller, the walls are plaster, and the house has already decided where the windows and the chimney sit. Many Bronxville kitchens were planned for a different century — a single cook, a separate dining room, little counter space — so the work is usually about opening the kitchen to the dining or family room within the old walls, not about adding square footage. That opening is structural work first: we confirm what is load-bearing, how the floor above is carried, and where the old plumbing and wiring run before anything is removed. Then comes the kitchen remodeling itself — cabinet systems fitted to uneven old walls, counters that can take daily use, and storage planned around how the family actually cooks. A kitchen done this way keeps the character of the house and gains the function it was missing.
Bathrooms in Bronxville’s older houses are usually the smallest rooms with the biggest hidden systems: cast-iron drains, galvanized supply lines, and tile set over plaster that has seen decades of steam. A bathroom renovation here starts behind the wall — we check drainage falls, venting, and whether the floor structure can carry a heavier tub or a curbless shower — because a beautiful finish over failing plumbing is a leak waiting to happen. Fitting a bathroom into an improbable corner is a planning exercise as much as a building one: where the stack runs, what can move and what cannot, and how to get light and air into a room the original builders treated as an afterthought. The visible work keeps the period style the house deserves: proportions, trim and tile choices that suit a colonial, Tudor or Victorian, paired with modern waterproofing membranes, ventilation and fixtures that actually work. That combination of old-house sensitivity and systems that last is what makes a renovated bathroom look right and stay dry.

Living spaces and full interiors in Bronxville are rarely about gutting a house; they are about rebalancing one that was built for different lives — opening a closed-off ground floor, giving a growing family a real primary suite, or turning an underused lower level into rooms that earn their keep. We start with the structure and the systems, not the finishes: what can open up, what the house will allow, and what the old plumbing and wiring honestly need before new work covers them. That is the same approach behind our full home renovation work, phased so the home stays liveable while rooms are redone in sequence. See all the areas we serve, and if you are comparing options, remember that Star Construction INC has been working on homes in the New York area since 2018.
Our clients value the consistency, structural precision, and long-term performance we deliver on every project, from initial planning through final execution.
![]()
Jav VTrustindex verifies that the original source of the review is Google.
Got my bathroom remodel Team was professional on time Thank you![]()
Ever fernando Perez saldañaTrustindex verifies that the original source of the review is Google.
Crear Word![]()
LUIS CAYOTrustindex verifies that the original source of the review is Google.
i hire them for my home project. and everyting went smoothly. no delays![]()
Shahid IqbalTrustindex verifies that the original source of the review is Google.
Very reliable contractor. They did exactly what they promised and the quality was excellent. Would definitely recommend.
Contact us now to discuss your project and receive a no-obligation quote from our experts.
Every project is handled through a defined process that ensures accuracy, efficiency, and long-term structural performance from start to finish.
We begin by reviewing site conditions, understanding project objectives, and identifying structural requirements to establish a clear and practical direction before any work begins.
A detailed execution plan is developed, including material selection, sequencing of work, and coordination of labor to maintain consistency and avoid delays during construction.
Work is carried out using proven installation methods, with attention to structural integrity, proper reinforcement, and adherence to safety and quality standards.
A final walkthrough is conducted to verify workmanship, resolve any outstanding details, and ensure the completed project meets performance expectations and durability standards.
Working in a pre-war Bronxville house is different from working in a new one: the materials are older, the construction is less forgiving, and the details that make the house valuable are the easiest things to destroy by accident. The deep window seats, the millwork, the ceiling heights — those are why people buy these houses, and they are the first things a careless renovation loses. Our work is planned around keeping them: what can open up, what the structure allows, and where the old systems honestly need renewal before finishes go on.
We protect plaster walls, original moldings, doors and trim instead of defaulting to demolition. When a wall must open, we open it carefully and close it up as if nothing happened, matching plaster and trim so the repair disappears. Window seats and built-ins are worked around, not removed, because they are part of the house’s character, not obstacles to it.
Before finishes go on, we open up what needs checking: supply lines, drains, and wiring that may predate the current owners. Renewal is done where it is genuinely needed and left alone where it is sound — we say which is which before quoting, so you are not paying to replace systems with decades of life left, and not living with ones that are already failing.
Old houses hide things: rot behind a shower, a beam that is not where the plans said, wiring added room by room over a century. When we find something unexpected, we stop, photograph what we found, and explain the options and the cost effect before continuing — no silent change orders, no discoveries buried under drywall.
Most Bronxville renovations happen while the family lives in the house. We phase the work, seal off work areas, and sequence rooms so you keep a working bathroom and a place to prepare food wherever the project allows. The house tolerates the work because the plan was made around how you actually live in it, not around the contractor’s convenience.
It depends on the scope. A straightforward kitchen remodel in an older Bronxville home typically takes four to eight weeks on site, once design and ordering are complete. Opening walls, moving plumbing or discovering old wiring that needs renewal can extend that, and cabinet and stone lead times set the real start date — we give you a schedule with those dependencies shown, not just a finish date.
Often yes, but it depends on whether the wall carries load from the floor above. We check the framing, how the floor above is carried, and where the plumbing and wiring run before anything is removed. Some walls can come out cleanly, some need a beam, and some are better left alone — we tell you which before quoting, so the plan you approve is one the house will actually allow.
Usually yes. We phase the work so you keep a working bathroom and a place to prepare food wherever the project allows, seal off work areas from living areas, and sequence rooms so the disruption is contained. Full-home work or a kitchen and bathroom done together can make staying impractical for a stretch — we say so honestly at the planning stage, not after demolition.
It depends on the work. Cosmetic updates like painting, flooring and like-for-like fixture swaps usually do not need a permit, while structural changes, moving plumbing or electrical, and layout changes generally do, under village approval. We check what applies to your project and flag it before work begins; costs depend on scope.
We measure the rooms, photograph existing conditions, and price the work in writing — materials, labor and the contingencies the house honestly suggests, like old wiring or plumbing renewal. Costs depend on scope: a like-for-like refresh costs far less than opening walls and moving services. If we find something unexpected once walls are open, we photograph it and explain the cost effect before continuing.