As interior renovation and remodeling contractors working across Manhattan, we handle the island’s interiors at both of their scales: the apartment and the townhouse. In co-ops and condos, the work is measured in rooms — a kitchen opened to the living space, a bathroom rebuilt within its existing footprint, a second bath carved from underused closet space. In townhouses, the work runs floor to floor — the parlor level restored, the garden level made livable, stair halls and period details carried through the whole house.
Most Manhattan projects center on the rooms that date fastest. Our kitchen remodeling work opens closed pre-war kitchens into the living space while keeping the apartment’s proportions intact, and our bathroom renovation work rebuilds cramped pre-war baths with modern fixtures and storage, planned around the building’s existing plumbing runs wherever that is sensible. In townhouses, basement finishing turns garden-level space into a family room, guest suite or home office, with moisture and light dealt with first, not last.
Where a townhouse renovation touches the shell of the house — a rear opening, a garden wall, the masonry around a new doorway — our masonry contractors in Manhattan handle that work in step with the interior, so the inside and the outside of the project stay one job, not two.
Interior renovation and interior remodeling are related but different scopes, and knowing which one a Manhattan apartment needs shapes the budget and the timeline. Renovation renews what is already there within the existing plan: plaster repaired and skimmed, floors refinished, a kitchen or bathroom rebuilt in place, fixtures and finishes updated. Remodeling changes the plan itself: a wall comes down between kitchen and living room, a closet run becomes a second bathroom, rooms are combined or redivided so the apartment works for the household living in it now.
In Manhattan, both scopes run through the same practical realities. Work happens inside occupied buildings with shared walls, shared halls and neighbors close by, so dust control, noise hours and protection of common areas are part of the job, not afterthoughts. Co-op and condo buildings generally review renovation scopes before work begins, and layout, plumbing or electrical changes generally need city permits and filings, while cosmetic work usually does not. A good plan settles those questions before demolition starts, not during it.

If you are searching for trusted interior remodeling contractors near you in Manhattan, Star Construction INC has renovated apartments, condos, co-ops and townhouses across the borough since 2018. Request a free, no-obligation estimate and we will walk your rooms with you, listen to how you live in them, and lay out the options honestly — what to open, what to keep, and what to phase. The areas we serve are listed on our service areas page.
Our clients value the consistency, structural precision, and long-term performance we deliver on every project, from initial planning through final execution.
![]()
Jav VTrustindex verifies that the original source of the review is Google.
Got my bathroom remodel Team was professional on time Thank you![]()
Ever fernando Perez saldañaTrustindex verifies that the original source of the review is Google.
Crear Word![]()
LUIS CAYOTrustindex verifies that the original source of the review is Google.
i hire them for my home project. and everyting went smoothly. no delays![]()
Shahid IqbalTrustindex verifies that the original source of the review is Google.
Very reliable contractor. They did exactly what they promised and the quality was excellent. Would definitely recommend.
Contact us now to discuss your project and receive a no-obligation quote from our experts.
Every project is handled through a defined process that ensures accuracy, efficiency, and long-term structural performance from start to finish.
We begin by reviewing site conditions, understanding project objectives, and identifying structural requirements to establish a clear and practical direction before any work begins.
A detailed execution plan is developed, including material selection, sequencing of work, and coordination of labor to maintain consistency and avoid delays during construction.
Work is carried out using proven installation methods, with attention to structural integrity, proper reinforcement, and adherence to safety and quality standards.
A final walkthrough is conducted to verify workmanship, resolve any outstanding details, and ensure the completed project meets performance expectations and durability standards.
Professional interior work in Manhattan is as much about the building as it is about the rooms. Deliveries come through lobbies and service elevators, debris leaves the same way, and every noisy phase has to fit the building’s working hours and its neighbors’ patience. A contractor who has done this work before plans the sequence — protection first, demolition contained, trades stacked so the plumber is not waiting on the plasterer — and keeps the apartment livable for as long as the scope allows. The four areas below are where that experience shows up most.
Most Manhattan renovations happen inside co-ops and condos, and the building is a stakeholder in every one of them. Buildings generally review the scope before work starts — plans, materials, contractor details — and set the working rules: approved hours, elevator and service-entrance bookings, protection for halls and lobbies, and dust and noise controls that keep neighbors onside. A renovation planned around those rules from the start avoids the mid-project pauses that blow up timelines, and it keeps the relationship with the building good for the next project too.
Inside the apartment, the work itself is about gaining space without losing character. Kitchens open to living rooms, closets become bathrooms or storage walls, and dated finishes are replaced while the bones — the plaster, the moldings, the proportions — stay. Costs depend on scope: a cosmetic refresh and a full gut with layout changes are different projects with different price ranges, and an honest estimate says which one is being quoted.
The kitchen and the bathroom are where a pre-war Manhattan apartment shows its age most plainly, and they are where a renovation pays back most visibly. The classic moves are well proven: the wall between kitchen and living room comes down where structure allows, creating one open room for cooking and gathering; the closed galley gives way to an island or peninsula with storage that reaches the ceiling; the single bath gains a second fixture set by borrowing space from an adjoining closet or dressing area.
What makes these moves work in Manhattan is respect for what cannot move cheaply. Plumbing stacks and risers generally stay where the building put them, so new fixtures are planned around existing runs rather than against them. Venting, waterproofing and sound separation between apartments are detailed properly the first time, because opening a finished wall a second time is the most expensive repair there is.
Townhouse renovations in Manhattan run floor to floor rather than room to room, and they reward a whole-house plan. The parlor floor sets the tone — restored moldings, refinished floors, a kitchen that connects to the garden rather than turning its back on it. Upper floors gain bathrooms and closets planned around the stair hall, and the garden level becomes real living space instead of a pass-through: a family room, a guest suite, a home office with proper light and moisture control.
Because townhouses are whole buildings, interior work often meets exterior work at the rear wall, the roofline or the garden. Sequencing the two together — interior finishes protected while shell work is done, openings made once and finished once — keeps the project to one timeline and one set of disruptions instead of two.
Manhattan’s pre-war apartments are worth renovating precisely because of what they already contain: thick plaster walls, deep moldings, paneled doors and hardware with a century of patina. Sound plaster can usually be repaired and skimmed rather than replaced, and moldings, doors and trim can be protected through the work and restored where they are damaged. Where a detail is too far gone, it is reproduced to match the original profile rather than swapped for a generic substitute.
The logistics of working in an occupied building get the same care. Dust barriers and daily cleanup keep the rest of the apartment livable, noisy phases are grouped into approved hours, and the project is phased so a working kitchen or bathroom survives as long as possible. When a full gut makes staying impractical, that is said plainly at the estimate stage, not discovered mid-project.
Yes, in most cases. Co-op and condo buildings in Manhattan generally review renovation plans before work begins, and many require a written scope, contractor details and insurance documentation as part of that review. The process and timing vary by building and by scope — a cosmetic refresh moves faster than a layout change with plumbing or electrical work. What we never promise is a particular board outcome; we prepare the scope clearly, answer the building’s questions, and plan the schedule around its review process.
Often yes, without moving every wall. Many pre-war layouts improve dramatically from a few targeted changes: removing a non-structural partition between kitchen and living room, widening a doorway, or borrowing space from an oversized closet or hall for a second bathroom. Structural walls, plumbing stacks and risers set the limits, and a proper assessment — what is load-bearing, what is just partition — comes before any demolition is priced.
Yes — and keeping them is usually the right call. Sound plaster can be repaired, re-keyed where it has loosened, and skim-coated to a paint-ready finish. Moldings, paneled doors and period hardware are protected during the work and restored where damaged. When a detail is beyond saving, it is reproduced to match the original profile, so the room keeps its period character rather than getting a generic replacement.
Often, yes — most apartment renovations are phased so you can stay. Dust barriers, daily cleanup and a working kitchen or bathroom kept available as long as possible make it workable, though there will be noisy days and days without a particular room. A full gut of a one-bathroom apartment is the exception; when staying is impractical, we say so at the estimate stage so you can plan around it.
It depends on the scope. Cosmetic work — painting, refinishing floors, replacing fixtures in place — generally does not need a Department of Buildings permit. Layout changes, plumbing or electrical moves, and structural work generally do, and the filings are part of the project plan. We confirm which category your scope falls into before work starts, so there are no surprises mid-project.