
As paint renovation and general contractors in New York, we start every Larchmont job the same way: by looking at the surface before talking about colour. The plaster walls of the older colonials and Tudors tell a story — hairline cracks at the corners, old patches that have sunk, ceilings marked by a leak that was fixed years ago. Outside, the story is in the siding and trim: paint that has lost adhesion, bare wood showing at the joints, caulk that has pulled away from the boards. Our interior and exterior painting work in Larchmont covers both, and where a repaint is part of a larger room-by-room update, we coordinate with our interior renovation contractors in Larchmont so the paint schedule fits the renovation sequence rather than fighting it. Every quote separates preparation from painting, so you can see exactly what the surface needs and what the finish will cost.
Paint renovation is not a coat of paint over whatever is there. It is the repair and preparation that makes a finish last: washing and scraping the failed coating, opening and filling cracks, stabilising loose plaster, sanding and priming bare spots, and only then applying the finish coats. In Larchmont that sequence matters more than usual, because the houses are older and their surfaces have more history — layers of paint over plaster that moves with the seasons, and wood trim that has been repainted many times. Our drywall and plaster repair work comes first wherever the wall needs it, and exterior power washing and surface preparation comes before any exterior coating, so the new paint bonds to a clean, sound surface instead of to dirt and loose paint. A finish applied over a failed surface fails with it; a finish applied over a prepared surface is the one that lasts.

Homeowners across the Manor and the village call us for whole-house repaints, single-room refreshes, and exterior work on houses that have not been painted properly in years. We walk the rooms and the exterior with you, surface by surface, and price the preparation openly — what needs repair, what needs only a wash and a prime, and what can honestly wait. If you are comparing options, see all the areas we serve, and remember that Star Construction INC has been working on homes in the New York area since 2018. Request a free, no-obligation estimate and we will measure the surfaces, note the repairs, and explain the sequence before any work begins.
Our clients value the consistency, structural precision, and long-term performance we deliver on every project, from initial planning through final execution.
![]()
Jav VTrustindex verifies that the original source of the review is Google.
Got my bathroom remodel Team was professional on time Thank you![]()
Ever fernando Perez saldañaTrustindex verifies that the original source of the review is Google.
Crear Word![]()
LUIS CAYOTrustindex verifies that the original source of the review is Google.
i hire them for my home project. and everyting went smoothly. no delays![]()
Shahid IqbalTrustindex verifies that the original source of the review is Google.
Very reliable contractor. They did exactly what they promised and the quality was excellent. Would definitely recommend.
Contact us now to discuss your project and receive a no-obligation quote from our experts.
Every project is handled through a defined process that ensures accuracy, efficiency, and long-term structural performance from start to finish.
We begin by reviewing site conditions, understanding project objectives, and identifying structural requirements to establish a clear and practical direction before any work begins.
A detailed execution plan is developed, including material selection, sequencing of work, and coordination of labor to maintain consistency and avoid delays during construction.
Work is carried out using proven installation methods, with attention to structural integrity, proper reinforcement, and adherence to safety and quality standards.
A final walkthrough is conducted to verify workmanship, resolve any outstanding details, and ensure the completed project meets performance expectations and durability standards.
Good paint work is mostly preparation, and Larchmont surfaces test that preparation harder than most. Plaster that has moved for a century, siding that faces the Sound, trim that has been painted over more times than anyone remembers — each surface needs its own sequence. Here is how we handle the four parts of a Larchmont paint job.
Inside a Larchmont home, we repair before we paint. Hairline plaster cracks are opened, filled and sanded flat; uneven walls get a skim coat so the new finish reads smooth in daylight; ceilings marked by old leaks are sealed before they are coated, so the mark does not bleed through. We protect floors, woodwork and furniture, and we keep the house liveable while rooms are done in sequence — one room finished and back in use before the next begins. The result is a finish that looks like it belongs in a house of this age, not a coat thrown over its problems.
Larchmont exteriors face the Sound’s humidity, driving rain and freeze-and-thaw winters, so siding, trim and masonry coatings fail first where water sits: at joints, under sills, and on the weather side of the house. We wash and scrape back to sound paint, repair or replace damaged boards and trim, re-caulk the joints, and prime every bare spot before the finish coats go on. Paint fails early near the coast when preparation is skipped, so we do not skip it — the extra days of prep are what buy the extra years of finish. Where a protective coating suits an exposed surface, we also offer waterproof coatings and finishes as part of the system.
Colour should suit the house, the light and the room, not just a swatch under a shop light. For Larchmont’s period homes we test colours on the wall itself and look at them in morning and evening light, because a shade that looks right at noon can turn cold or muddy by dusk. We talk through sheen as well as colour: washable finishes where hands and daily life touch the walls, flatter finishes where you want the plaster’s texture to read, and durable coatings on trim that gets knocked and cleaned. Our color consultation and custom finishes help you choose once, with samples on your own walls, rather than repainting a room you never liked.
Our prep standard is the same on a single room and a full exterior: inspect in daylight, repair the surface, wash and scrape back to sound coating, sand the edges smooth, prime the bare spots, and caulk the joints before any finish coat. We use primers and coatings matched to the surface — plaster, wood, previously painted masonry — rather than one product for everything, and we do not paint over damp, dirty or loose surfaces. That discipline is the difference between a finish that peels in two seasons and one that is still sound years later, and it is why our quotes itemise preparation instead of burying it.
It depends on exposure and preparation. A well-prepared exterior in Larchmont often lasts seven to ten years before it needs repainting, though south- and Sound-facing siding and trim weather faster. We inspect in daylight and tell you which elevations actually need work rather than quoting the whole house by default.
No — paint over a crack just prints the crack through the new finish, and it usually reopens. We open the crack, fill and sand it flat, and skim-coat where the plaster is uneven, so the new paint sits on a sound surface. If the plaster is loose or the movement is ongoing, we say so before painting.
Homes built before 1978 may have lead-based paint, so we treat old paint with care: we avoid dry sanding and scraping that creates dust, keep the work area contained, and clean up thoroughly. Where testing or specialist handling is needed, we tell you before work starts and arrange the right approach rather than painting over the problem.
A typical Larchmont house exterior takes about a week to two weeks, depending on size, condition and how much repair and prep the surfaces need. Weather can move the schedule — paint needs dry surfaces and suitable temperatures — and we give you a sequence before work starts so you know what happens each day.
Late spring through early fall is the usual window in Westchester, when temperatures and humidity suit exterior coatings and surfaces dry reliably. We avoid painting in cold, damp or very hot spells, and interior painting can be done at any time of year.