Local Law 11 — the Facade Inspection & Safety Program — requires every New York City building over six stories to have its exterior walls inspected by a Qualified Exterior Wall Inspector (QEWI) once every five years, with the findings filed with the Department of Buildings. Harlem’s covered buildings are largely pre-war: load-bearing brick facades with stone lintels and sills, terra cotta and cast-stone trim, projecting cornices and parapets that have weathered a century of freeze and thaw. Their reports cite the era’s conditions — open mortar joints, cracked stone, corroded lintels, parapet movement, cornice metal failure. Star Construction INC, serving New York since 2018, repairs exactly that work in Harlem, and coordinates with your QEWI from the site evaluation until the amended report is filed. Where a facade sits inside one of Harlem’s historic districts, exterior work can also involve Landmarks Preservation Commission review — sequencing accounts for it rather than discovering it mid-job. Inspections and filings remain your QEWI’s by law. Cycle 10 is open: your sub-cycle follows your block number, Sub-cycle 10A closes 21 February 2027, and open Cycle 9 SWARMP conditions reclassify as UNSAFE on that date.
Local Law 11 — the Facade Inspection & Safety Program — requires every New York City building over six stories to have its exterior walls inspected by a Qualified Exterior Wall Inspector (QEWI) once every five years, with findings filed with the Department of Buildings. Harlem’s stock is the program’s classic subject: masonry buildings raised a century ago, carrying ornamented stone and terra-cotta, projecting cornices, steel lintels and full-perimeter parapets — architecture worth keeping, whose joints and metal now need exactly the renewal FISP exists to enforce. Star Construction INC, serving New York since 2018, performs the repair side of the program in Harlem. We repoint and restore masonry and stone, rebuild parapets, repair lintels and cornices, and cure the conditions your report cites — coordinating with your QEWI until the amended report can be filed. Where a building’s facade work also falls under landmark considerations, repairs are planned with your engineer so the correction satisfies both the filing and the facade. Inspections and filings are your QEWI’s by law; the repairs are ours. Cycle 10 is open: your sub-cycle follows your block number, Sub-cycle 10A closes 21 February 2027, and open Cycle 9 SWARMP conditions reclassify as UNSAFE on that date.

Every successful build begins with proper evaluation, planning, and method selection to ensure structural stability and long-term performance.
Stone and masonry facade restoration to FISP findings for Harlem's pre-war buildings.
Parapet rebuilding, coping and flashing renewal for Harlem's pre-war buildings.
Cornice and lintel repair and replacement for Harlem's pre-war buildings.
Brick and stone repointing for Harlem's pre-war buildings.
Terra-cotta and facade-element repair coordination with your engineer for Harlem's pre-war buildings.
Facade waterproofing and sealant renewal for Harlem's pre-war buildings.
The deadlines in that report are set by law: UNSAFE conditions corrected within 90 days of filing, $1,000 per month for late filing, $5,000 per year for failure to file, and up to $25,000 for uncorrected UNSAFE conditions. Harlem boards and managing agents send us the report first — the review is free. We walk the facade with the cited conditions in hand and return a written quote that answers the report line by line: what will be repaired, in what order, and what your QEWI will need to see before the amended report goes in within two weeks of correction. For buildings in historic districts, that plan also maps the review steps the exterior work may need, so the schedule the board approves is the schedule that actually happens.
Our clients value the consistency, structural precision, and long-term performance we deliver on every project, from initial planning through final execution.
Contact us now to discuss your project and receive a no-obligation quote from our experts.
Every project is handled through a defined process that ensures accuracy, efficiency, and long-term structural performance from start to finish.
We begin by reviewing site conditions, understanding project objectives, and identifying structural requirements to establish a clear and practical direction before any work begins.
A detailed execution plan is developed, including material selection, sequencing of work, and coordination of labor to maintain consistency and avoid delays during construction.
Work is carried out using proven installation methods, with attention to structural integrity, proper reinforcement, and adherence to safety and quality standards.
A final walkthrough is conducted to verify workmanship, resolve any outstanding details, and ensure the completed project meets performance expectations and durability standards.
Harlem boards choose Star Construction INC because we keep the program’s critical distinction exact: your QEWI inspects and files, we repair — coordinating with that QEWI at every step so nothing is rebuilt twice or corrected to the wrong standard. We review FISP reports free and quote in writing with no obligation, we install and arrange the sidewalk sheds our facade work requires, and we have served New York since 2018 — which in Harlem means a contractor fluent in pre-war construction: brick, stone, terra cotta and cornice metal, and in the practical work of repairing an occupied avenue building without closing its street.
Free report review — send your FISP report; we confirm the cited conditions and your cycle deadline.
Site evaluation — we inspect the facade areas named in the report with your managing agent.
Written quote — a line-by-line repair quote answering the report, with no obligation.
QEWI coordination — repair sequencing agreed with your QEWI before work starts. Repairs + protection — sidewalk shed installed; SWARMP/UNSAFE conditions corrected. Close-out support — corrected conditions ready for your QEWI’s amended filing within two weeks.
Recent masonry, roofing, concrete and renovation work completed for residential and commercial properties across New York.
No — brownstones are under six stories and outside the Facade Inspection & Safety Program. Harlem’s covered buildings are its larger pre-war elevator buildings and newer residences over six stories; those file every five years, with Sub-cycle 10A closing 21 February 2027.
It can add a Landmarks Preservation Commission review step for exterior work. We plan for it in the quote and sequence, coordinating with your QEWI, so approvals and repairs run in the right order instead of stalling each other.
No — only a QEWI can inspect and file. We are the repair contractor: we cure the conditions your QEWI documents and coordinate with them through correction and the amended filing.
Open mortar joints, cracked stone lintels and sills, corroded steel lintels, parapet and cornice conditions, and spalling brick — the pre-war set, and all standard scopes for us, quoted line by line against your report.
UNSAFE conditions must be corrected within 90 days of filing, with public protection such as a sidewalk shed in the meantime. Send us the report — the review is free, and the UNSAFE items are prioritised in the written quote.